Facilities Buildup
A complete work breakdown for building a data hall: the room itself, the power path that feeds it, the cooling that keeps it in range, the systems that protect it, and the racks and cabling that carry the load. We fit out retail IT infrastructure on the same basis.

Scope
What thework covers
Construction
The shell and the white space, specified around the operating envelope the equipment actually needs.
- Site selection
- White space operation set points
- Building construction
- Wall partitioning
- Access floor
- Fire rated doors
- Safe IT room
Electrical
The power path from incoming supply to the rack, sized from a real load calculation rather than a rule of thumb.
- Power load calculation
- Static UPS
- Dynamic UPS
- Generator plant
- ATS and RMU
- HV/LV distribution systems
Mechanical
Heat rejection matched to density, including free cooling where the climate and the load profile allow it.
- Chiller plant
- Cooling towers
- DX systems
- CRAC and CRAH
- Targeted cooling
- Free optimized cooling
Security systems
Detection, suppression, and access control planned alongside the electrical and mechanical work, not bolted on afterwards.
- Fire suppression systems
- Access control planning points
- DCIM and asset management
- Physical security
- CCTV systems
Telecommunications
Racks, containment, and structured cabling delivered pre-terminated, so the hall is tested and traceable on handover.
- Rack systems
- OCP racks
- Containment solutions
- Intelligent PDU
- Pre-terminated cabling
- Cable raceway
Retail fit-out and installation
IT infrastructure fit-out for retail estates, drawing on the same engineering discipline applied to the data hall. PASS specializes in retail IT infrastructure alongside the information and telecommunication technology sectors.
Equipment in this scope
- Modular UPSScalable high-power three-phase UPS from 500 kW to 1500 kW, with up to 99% efficiency in eConversion mode.
- Metered Rack PDURack power distribution with active metering, configurable alarm thresholds, and remote access.
- Aisle ContainmentDoor and roof systems that separate hot and cold air, raising the efficiency of the cooling plant already installed.
- Server RacksSheet steel enclosures, 42U to 52U, with 1700 kg load capacity and vented front and rear doors.
- DCIMReal-time visibility of power, cooling, connectivity, security, and environment across the estate.
Other lines of work
- Consultation and CertificationsDesign packages, engineering validation, and certification documentation for third-party bodies.
- Uptime and Business ContinuityTurnkey delivery, migration, commissioning, maintenance programs, and PUE improvement.
- Facility Management24/7 support backed by held spares and a maintenance team of more than 20 technicians.
Get started
Discussfacilities buildup
Send the site, the load, and the deadline. We will tell you what the work involves and what it takes to do it properly.